摘要
生产过程的混合装配线平衡问题,分为在确定条件下的最小生产循环单元的静态平衡问题和不确定条件修正过后的动平衡问题.针对确定工位条件下的混装生产线,构建其静态平衡模型,分析不确定因素,并以操作工人的操作时间不确定性为例,研究时间不确定性动态平衡.利用Flexsim软件,通过仿真进行了验证.相关实验验证了上述方法和结论的正确性.
The balance of Hybrid assembly line production includes the conditions in determining the smal- lest units of production cycle and the static balance conditions after the amendment of the balancing prob- lem of uncertain conditions. The mixed production line under the known workshops is expounded in the paper and a static model is established to analyze uncertain factors. The work's operating time of uncer- tainty is taken for an example to build a dynamic equilibrium model for uncertain time. In the end, the re- sults are mixed into Flexsim, which is verified with simulation. And the related experiments also proved the above results.
出处
《湖北工业大学学报》
2010年第4期4-7,共4页
Journal of Hubei University of Technology
基金
国家自然科学基金项目(50875190/E051005)
关键词
生产过程混合装配线
最小生产循环单元
动静态平衡
装配线平衡
hybrid assembly line of production process
minimum production cycle unit
static and dynamic balancing
assembly line balancing