水口水电站运行方式对发电和下游通航影响的试验研究 被引量:2

Influence of Modes of Operation on Power Generation and Downstream Navigation for Shuikou Hydroelectric Project
原文传递
导出
摘要 通过水力模型试验,在几何比尺λ=100正态整体模型上,研究水口水电站正常运行期一溢流坝不泄洪;和汛期先泄洪后发电或先发电再泄洪时,电站尾水渠及航道段波高、水位涨率、水位涨幅及流速等水力参数,及其对电站7台机组出力(7×200MW)、机组稳定和通航的影响.在此基础上提出较为合理的运行方式. This paper deals with the parameters developing under the normal operation (nondischarging) seasons, or under the generation states after or before the discharging, such asthe wave heights in the tailrace and the navigation channel, rate and amplitude of the waterrising levels and the velocities etc., and the effects of the parameters on the water power andstable operation as well as the navigation. Based on these, some more reasonable modes ofoperation are presented.
作者 谢佩珍
出处 《福州大学学报(自然科学版)》 CAS CSCD 1999年第2期81-86,共6页 Journal of Fuzhou University(Natural Science Edition)
关键词 水电站 水位 尾水渠 航道 运行方式 发电 通航 hydropower station wave height water levels tailrace navigation channel
  • 相关文献

参考文献6

  • 1-.长江三峡工程枢纽总体布置优化专题.双线连续多级船闸引航道优化布置及其非恒定流研究报告[M].南京水利科学研究院航道研究所,1990.8-8.
  • 2田咏沅.三峡水利枢纽升船机研究[J].人世长江,1986,(5):5-13.
  • 3阿尔汉盖里斯基B.A. 王承树(译).河流中不稳定流动的计算[M].北京:北京科学出版社,1954.5-13.
  • 4Bravo H R,J Waterway Port Coastal Ocean Eng,1991年,117卷,4期,1页
  • 5田咏沅,人民长江,1986年,5期,5页
  • 6王承树(译),河流中不稳定流动的计算,1954年,5页

共引文献1

同被引文献13

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部