摘要
莱钢炼钢厂5#转炉于2007年5月扩容改造为120t转炉,新系统投入使用后,技术人员对炉倾变频、氧枪仪表、散状料上料监控系统、一次除尘系统进行了技术改造,对生产中控制系统的瓶颈问题进行了有效的解决。
Tbe No.5 converter in LaiWu Iron And Steel Group Co Ltd has been converted into 120t converter, After the new system was put into use, The engineers carried out technical innovation in the control of converter drive and the instrument of oxygen lance and the SCADA System of charging and the switch of dust removal system, The bottlenecks of control system was eliminated effectively.
出处
《科技信息》
2010年第21期I0104-I0105,共2页
Science & Technology Information
关键词
炉倾控制
氧枪水流量监测
远程上料监控
除尘切换
The control of converter drive
Monitoring of oxygen lance cooling water flux
The SCADA System of charging
The switch of dust removal system