3Lindstorm R R. Simulation and Field Tests of the Black Start of a Large Coal-fired Generating Station Utilizing Small Remote Hydro Generation. IEEE Trans on Power Systems, 1990, 5(1):162-168
4Adibi M M, Borkoski J N, Kafka R J. Power System Restoration-The Second Task Force Report. IEEE Trans on Power Systems, 1987, 2(2): 927-933
5Zhu Y L. Graphic-assisted Expert System for Power System Black Restart. In: Proc of IEE International Conference on APSCOM'91. London: IEE, 1991. 514-517
6Power System Restoration Working Group. Special Considerations in Power System Restoration. IEEE Trans on Power Systems,1992, 7(4): 1419-1427
7熊惠敏 房鑫炎 郁惟镛 FangXinyan YuWeiyong etal).(XiongHuimin,电力系统全网停电后的恢复——黑启动综述(The Summary of Black—start—restoration of Electrical Power System After Blackout)[J].电力系统及其自动化学报,.
8董张卓(DongZhangzhuo).电力系统事故后恢复智能决策系统研究:[博士学位论文](Research on Intelligence Decision Support System for Power System Restoration, Doctoral Dissertation)[A]..[C].西安:西安交通大学(Xi''an:Xi''an Jiaotong Unive),..