期刊文献+

汶川地震引发的山地灾害以及堰塞湖的管理方略 被引量:16

Management of quake lakes and triggered mass movements in Wenchuan earthquake
下载PDF
导出
摘要 汶川地震触发了大规模的崩塌与滑坡等山地灾害,形成众多堰塞湖。为分析其风险与应对措施,本文通过野外考察、卫星影像与数据分析等方法,研究了灾后堆积体与堰塞湖的稳定性,以及它们与下切性河流之间的关系。结果显示,山地灾害在不同程度上释放了潜在势能,其中滑坡释放能量最大,因此滑坡堆积体的稳定性较好,而崩塌堆积体稳定性较差。从长期治理角度看,若能控制河床下切则可避免部分灾害的产生。堰塞湖管理方略包括两种:对于风险高的堰塞湖应以拆除为主,而对于风险很小的堰塞湖则应予以保留。震区大部分河流处于不稳定的下切拓宽阶段。保留堰塞湖可以加大河床阻力,使河流提前达到平衡,降低未来地震中山地灾害发生的风险。 The Wenchuan earthquake triggered numerous avalanches and landslides and created many quake lakes. The stability of mass movement deposits and quake lakes and its relationship with riverbed incision are studied by field investigations together with satellite images and data analysis. The mass movements released different degrees of potential energy. The landslides have released the most of its energy and have high stability. The avalanche deposits have lower stability and are dangerous. From the viewpoint of river training, some landslides might be prevented if the riverbed incision were controlled. Two strategies are applied to manage the quake lakes: to remove the high risk lakes and to preserve the low risk lakes. Most rivers in the earthquake-hit area are in unstable geomorphology stage. Lakes preservation may change the rivers into equilibrium, thus, reduce the mass movements in a future earthquake event.
出处 《水利学报》 EI CSCD 北大核心 2010年第7期757-763,共7页 Journal of Hydraulic Engineering
基金 国家重点基础发展计划(973)项目(2008CB425803) 水利部公益性行业科研专项经费项目(2007SHZ0901034)
关键词 汶川地震 崩塌 滑坡 堰塞湖 河流下切 管理方略 Wenchuan earthquake avalanches and landslides quake lake river-bed incision management strategies
  • 相关文献

参考文献2

二级参考文献11

  • 1徐江,王兆印.阶梯-深潭的形成及作用机理[J].水利学报,2004,35(10):48-55. 被引量:60
  • 2Zhao-YinWANG,JiangXU,ChangzhiLI.DEVELOPMENT OF STEP-POOL SEQUENCE AND ITS EFFECTS IN RESISTANCE AND STREAM BED STABILITY[J].International Journal of Sediment Research,2004,19(3):161-171. 被引量:18
  • 3王兆印,程东升,何易平,王洪铸.西南山区河流阶梯—深潭系统的生态学作用[J].地球科学进展,2006,21(4):409-416. 被引量:38
  • 4曹凑贵.生态学基础[M].北京:高等教育出版社,2002.
  • 5Whittaker J G, Martin N R Jaeggi. Origin of step-pool system in mountain streams [J]. Journal of Hydraulic Division, ASCE, 1982, 108: 758-773.
  • 6Grant G, Swanson F J, Wolman M G. Pattern and origin of stepped-bed morphology in high-gradient streams, western Cascades, Oregon [J]. Geological Society American Bulletin, 1990, 102: 340- 352.
  • 7Anne Chin. The morphologic structure of step-pool in mountain streams[J]. Geomorphology, 1999, 27:191 -204.
  • 8Abrahams A D, Li G, Atkinson J F. Step-pool stream: Adjustment to maximum flow resistance [J]. Water Resources Research, 1995, (10): 2593-2602.
  • 9Lenzi M A. Stream bed stabilization using boulder check dams that mimic step-pool morphology features in northern Italy [ J] . Geomorphology, 2002, 45 : 243 - 260.
  • 10Smith M J, Kay W R, Edward D H D, et al. AusRivAS: Using macro-invertebrates to assess ecological condition of rivers in Western Australia [J]. Freshwater Biology, 1999, 41: 269- 282.

共引文献57

同被引文献221

引证文献16

二级引证文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部