期刊文献+

基于异构型结点的任务均衡调度研究

A Study on Tasks Equipoise Scheduling in Heterogeneous Nodes
下载PDF
导出
摘要 该文以实现时间最短为目标,全面考虑影响任务集实现开销的各种因素,建立了异构型结点集中带偏序关系的任务集的均衡调度模型及其随机搜索算法。调度模型将任务集实现过程分成:执行、传递和等待,强调执行和传递的并行性,降低因等待而发生的费用。算法在统计意义下为多项式时间复杂度。这一模型在工作时限要求较高的领域应用前景广泛。 This paper studies an equipoise scheduling model, which is based on considering overdl influence fac- tors of overhead with precedence order of the set of tasks in hetenogeneous nodes,and its random searching al- gorithm.The materialized process of the set of tasks is disported:executing,transmiting and waiting.Model declhes waiting costs on emphasizing parallel of executing and transmitting. The algorithm's complexity of calcu- lation is polynomial in a speciftc statistic's sense. This model is utilized widespreadly in domains of tasks which requiring higher time limit.
作者 王群 周之英
出处 《计算机工程与应用》 CSCD 北大核心 1999年第3期1-3,7,共4页 Computer Engineering and Applications
关键词 异构型结点集 调度问题 任务均衡调度 计算机 tasks scheduling, precedence relation, heterogeneous nodes
  • 相关文献

参考文献5

二级参考文献10

  • 1高红,熊光楞.决策规则在仿真调度中的应用[J].控制与决策,1995,10(2):114-118. 被引量:24
  • 2黄小原,刘海龙.零工工厂多机多目标调度[J].系统工程,1995,13(5):32-36. 被引量:7
  • 3郑维敏,系统工程FORTRAN程序集,1984年
  • 4马希文,正交设计的数学理论,1975年
  • 5杨羽,计算机学报,1993年,16卷,9期
  • 6尹祚明,计算机学报,1989年,12卷,1期
  • 7毛建忠,控制与决策,1995年,10卷,5期,411页
  • 8尹新,控制与决策,1995年,10卷,6期,525页
  • 9项思明,系统工程理论方法应用,1994年,3卷,4期,27页
  • 10黎志成,管理系统模拟,1989年,19页

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部