摘要
在总结分析武广客运专线项目投资控制的基础上,强调在项目建设期针对不同环节采取相应的措施,才能更有效地控制投资。并提出了进一步改进项目投资控制的措施。
Based on the analysis and summary of investment control in the project of Wuhan-Guangzhou Passenger Dedicated Line, emphasis is made on the adaptation of corresponding measures aiming at different links during the construction period of the project, so as to control the investment more effectively. Measures are also proposed for further improvement of project investment control.
出处
《中国勘察设计》
2010年第7期45-47,共3页
China Engineering Consulting
关键词
客运专线
投资控制
改进措施
passenger dedicated line
investment control
improvement measures