期刊文献+

面向CAPP/PPS集成的多工艺方案创成方法的研究 被引量:4

A GENERATIVE APPROACH FOR DEVELOPING ALTERNATIVE CAPP SOLUTIONS TOWARDS CAPP/PPS INTEGRATION
下载PDF
导出
摘要 基于并行工程的理论,建立了CAPP与PPS(ProductionPlanning&Scheduling)并行设计过程模型并讨论了工艺规划决策方法,为实现CAPP与PPS的集成奠定了基础。CAPP生成多个可行工艺方案是CAPP与PPS集成的需要,本文讨论了多工艺方案的表示方法,基于多工艺路线与/或图表示,提出了一种行之有效的生成多工艺路线的启发式方法并给出了应用实例。 Based on CE theories and methodolgies, a generative approach for developing alternative CAPP solutions to address the integration of CAPP/PPS in the implementation of Concurrent Engineering(CE) proposed in this paper. A concurrent design process model is first established to facilitate the decision making, which leads to generation of alternative process plans with downstream PPS requirements under consideration. An AND/OR graph mechanism is adopted to represent possible variants of the manufacturing processes. A case study of typical workpiece manufacturing is discussed in detail to demonstrate the effectiveness and feasibility of the proposed approach.
出处 《计算机集成制造系统-CIMS》 EI CSCD 1999年第1期69-72,共4页
关键词 CAPP 多工艺方案 PPS 集成 并行工程 CAPP, CAPP/PPS Integration, Alternative Manufacturing Processes
  • 相关文献

参考文献7

  • 1段广洪,吴瑞荣,王先逵,张玉云.基于STEP的面向对象工艺计划信息模型[J].计算机集成制造系统-CIMS,1997,3(4):20-23. 被引量:6
  • 2吴会林.机械产品并行设计理论与方法学的研究及其工程应用[博士论文].天津:天津大学研究生院,1996..
  • 3吴德中 马登哲 等.CAPP和PPC集成中的工艺表示问题.第四届中国计算机集成制造学术会议[M].,1996.366-369.
  • 4段广洪,计算机集成制造系统CIMS,1997年,3卷,4期,21页
  • 5吴德中,第四届中国计算机集成制造学术会议,1996年,366页
  • 6吴会林,博士学位论文,1996年
  • 7Zhao H C,Ann CIRP,1993年,42卷,1期,513页

共引文献5

同被引文献23

  • 1ZHANG H C,MALLUR S.An integrated model of process planning and production scheduling[J].International Journal of Computer Integrated Manufacturing,1994,7(6):356-364.
  • 2IWATA K,FUKUDA Y.A new proposal of dynamic process planning in machine shop[A].Proceedings of CIRP International Workshop on Computer Aided Process Planning (CAPP)[C].Germany Hanover University,1989.73-78.
  • 3CHANG H C,CHEN F F.A dynamic programming based process planning selection strategy considering utilization of machines[J].International Journal of Advanced Manufacturing Technology,2002,(19):97-105.
  • 4JOO J,PARK S,CHO H.Adaptive and dynamic process planning using neural networks[J].International Journal of Production Research,2001,39(13):2923-2936.
  • 5MATURANA F,GU P,NAUMANN A.Object-oriented job-shop scheduling using genetic algorithms[J].Computer in Industry,1997,(32):281-29.
  • 6Kumar M, Raiotia S. Integration of scheduling with computer aided process planning[J]. Journal of Materials Processing Technology, 2003,138:297~300.
  • 7Sundaram R M, et al. Development of on-line, real time, scheduling methods for a computer aided manufacturing system[J]. Ann. CIRP, 1983,32(1).
  • 8Kim Y K, et al. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling[J]. Computers & Operations Research, 2003,30:1151~1171.
  • 9Bierwirth C, Mattfeld D C. Production scheduling and rescheduling with genetic algorithms[J]. Evolutionary Computation, 1999,7(1):1~17.
  • 10[日]玄光南 陈润伟.遗传算法与工程设计[M].北京:科学出版社,2000..

引证文献4

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部