摘要
以加速产品设计为目的的并行工程,需要对其过程进行有效规划.规划的目的之一要达到在规定的时间内,将合适的任务分配给合适的人.由于设计过程中存在的不确定性和影响因素的动态性和多样性,需要新的任务分配算法.文中提出了一种选择合适任务、确定任务难度、根据任务难度和人员能力进行任务分配的算法.
One of important aims of Concurrent Engineering
(CE) is to accelerate product design process. Efficient methods should be taken to control the
design process in order to implement CE successfully. Task assignment should be carried out
to assign right tasks to right person in right time. Because of the uncertainty and the dynamic
and multiple factors involved, a new kind of task assignment way should be found. In the paper,
a new method is introduced which includes to choose right tasks, to determine the difficulty
degree of tasks and assign task according to the ability of designers. All these ways can meet
the needs of CE.
出处
《计算机辅助设计与图形学学报》
EI
CSCD
北大核心
1999年第2期168-171,共4页
Journal of Computer-Aided Design & Computer Graphics
基金
国防预研项目资助