期刊文献+

南水北调运行风险管理研究 被引量:13

Risk Management of the South-to-North Water Transfer Project
下载PDF
导出
摘要 介绍"十一五"国家科技支撑计划项目——"南水北调运行管理关键技术问题研究"课题的主要成果。课题在南水北调工程运行风险分类与相互关系、风险识别与风险机理、风险预测与控制和风险安全保障预案等方面取得了重大突破,许多成果填补了国内空白,成果具有很强的实用性,为南水北调未来运行的风险管理奠定了良好基础。 This paper mainly discusses the research results of the Key Technology in Risk Management during Operation of the South-to-North Water Diversion Project, which is supported by National Key Technology, R&D Program in the 11 th Five-Year Plan. The contents about risk classification and relationship, risk recognition and mechanism of risk, risk prediction and controlling, risk safety guarantee preparedness have achieved great breakthroughs. Many results fill a domestic gap in the field and have been in strong practicality, establishing a good foundation for the risk management during future operation of the South-to-North Water Diversion Project.
作者 刘恒 耿雷华
出处 《南水北调与水利科技》 CAS CSCD 2010年第4期1-6,共6页 South-to-North Water Transfers and Water Science & Technology
基金 "十一五"国家科技支撑计划资助项目(2006BAB04A09)
关键词 南水北调 工程运行 风险管理 东线 中线 the South-to-North Water Diversion Project,project operatiom risk management eastern route middle route
  • 相关文献

参考文献5

二级参考文献45

共引文献74

同被引文献121

引证文献13

二级引证文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部