摘要
介绍了引进型600 MW超临界汽轮机组中压缸启动的主要步骤,分析了其中应注意的事项,总结了中压缸启动的优缺点,并提出了进一步改进启动方式的建议。
The text introduces the main processure of IP casing start-up for introduced type 600 MW supercritical turbine units,analyzes the hereinto notice,summarizes the excellence and blemish of IP casing start-up,and indicates the suggest to father improve on start-up mode.
出处
《发电设备》
2010年第4期249-252,共4页
Power Equipment
关键词
汽轮机
中压缸
启动
暖缸
切缸
turbine
IP casing start-up
warming casing
change-over casing