摘要
结合某具体工程实例,介绍了人工挖孔桩桩身离析及桩底夹渣的处理方法,分别对桩身离析和桩底夹渣的原因进行了分析,提出了具体的处理措施并阐述了工艺步骤及检测方法,为今后类似工程积累了经验。
Combining with one specific project, the thesis introduced the treatment method for the segregation of the body and slag at the bot- tom of the artificial diggirtg piles, separately analyzed the causes for segregation of the body and slag at the bottom of the piles, put forward the specific treatment measures and illustrated the technology procedure and monitoring method, which accumulated the experience for the similar projects in the future.
出处
《山西建筑》
2010年第23期129-130,共2页
Shanxi Architecture
关键词
人工挖孔桩
桩身离析
桩底沉渣
处理措施
artificial digging pile, segregation of the pile body, slag at the bottom of the pile, treatment measure