双线钢管混凝土简支系杆拱桥顶推施工浅议 被引量:2

Brief discussion on incremental launching construction of concrete filled double-lane steel pipe simple supported tied arch bridge
下载PDF
导出
摘要 依托津秦客专工程津山外绕汤河特大桥上跨既有秦东下行线顶推施工,分析了系杆拱桥顶推施工重点及难点,详细介绍了设计施工方案及步骤,具体阐述了顶推施工关键工艺及工序,以期指导类似工程的施工。 According to the incremental launching construction of existing Qindong down line on the up-span of Tanghe extra big Bridge sur- rounded by Jinshan in Jin-Qin passenger special line project, the thesis analyzed the important points and difficult points in incremental launch- ing construction of tied arch bridge, made a detailed introduction to designing construction plan and procedure, expounded the key technology and processes of the incremental launching construction, so as to guide the construction of the similar projects.
作者 占有志
出处 《山西建筑》 2010年第23期314-315,共2页 Shanxi Architecture
关键词 钢管混凝土 简支系杆拱桥 顶推 施工 concrete filled steel pipe, simply supported tied arch bridge, incremental launch, construction
  • 相关文献

参考文献4

二级参考文献2

共引文献45

同被引文献14

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部