研究目的:过渡段是刚性桥台或其它构筑物与柔性路堤的结合部位,在结构上是塑性变形和刚度的突变体,施工过程中必须采取措施减少两者之间的塑性变形差,控制工后沉降,实现平稳过渡。本文结合沪宁城际铁路站前Ⅳ标相关过渡段工程,对施工过程及工后沉降观测数据进行分析,总结沉降规律。研究结论:采用级配碎石处理过渡段工程,沉降总量不大但沉降呈现一定规律。过渡段最大沉降发生在距结构物10~15m处,沉降大小与填土高度成正比,沉降速率与填筑时间正相关。工后随着"堆载预压",总体沉降量将趋于稳定。
Research purposes:The transition section is a joint section between rigid abutment or other structures and flexible embankment and it is a mutant of plastic deformation and rigidity in structure.So during the construction,the measures must be taken for reducing the plastic deformation difference between them,to control post-construction settlement and to achieve smooth transition.Combination of the relevant transition section of Pre-station Bidding IV of Shanghai-Nanjing intercity railway,this paper analyzes the observed data on the settlements during construction and after construction,and summarizes the settlement law.Research conclusions:Using graded gravel to reinforce the transition section,the total amount of settlement is not large with a regular pattern.The largest amount of settlement of the transition section occurs at the area where is 10-20 m away from structures,and the amount of settlement is proportional to filling height,and the settlement velocity is in the positive correlation with filling time.With the "heaped loading and pre-pressing" after construction,the overall settlement tends to steady state.
出处
《铁道工程学报》
EI
北大核心
2010年第7期38-41,47,共5页
Journal of Railway Engineering Society
关键词
高速铁路
过渡段
沉降
规律
high-speed railway
transition section
settlement
law