摘要
文章对山西某煤焦化集团热电分厂130t/h循环流化床锅炉煤仓在运行中经常发生堵煤和搭桥等不正常现象的原因及其危害进行分析,并提出了解决措施,从而为锅炉的安全、稳定运行提供了保证。
The paper makes analysis of some fault in coal bin in 130 t/h circulating fluidized bed boiler. The solutions are proposed for boiler operation security.
出处
《机械管理开发》
2010年第5期97-97,99,共2页
Mechanical Management and Development
关键词
CFB锅炉
煤仓
缺陷
解决措施
CFB Boiler
Coal Bunker
Defects
Resolution Steps