期刊文献+

深圳地铁隧道邻接问题施工力学行为研究 被引量:1

Study on Mechanical Behavior of Adjacent Tunnel Construction in Shenzhen Metro
下载PDF
导出
摘要 针对深圳地铁2号线新建隧道邻接既有地铁隧道工程,利用FLAC3D软件进行有限元数值模拟施工力学行为研究,探讨了施工过程地层应力的变化幅度及影响范围、结构内力及结构安全性,提出了确保新建隧道施工和既有隧道运营安全的措施和建议,为隧道交叉段监控量测系统的设计、施工方案的优化及安全控制提供依据。 For the newly-built tunnel construction adjacent to the existing metro tunnel in No.2 Line of Shenzhen Metro,mechanical behavior of finite element numerical simulation is studied with FLAC3D software to explore the range of variation and influence of strata stress,structural inner force and structural safety during construction,and put forward the measures and suggestions for new tunnel construction and the existing tunnel safe operation,which provides basis for monitoring system design,construction program optimization and safety control in cross section of tunnel.
出处 《路基工程》 2010年第4期113-115,共3页 Subgrade Engineering
关键词 新建隧道 邻接施工 既有隧道 力学行为 数值模拟 newly-built tunnel adjacent tunnel construction existing tunnel mechanical behavior numerical simulation
  • 相关文献

参考文献5

二级参考文献18

  • 1王国强.实用工程数值技术及其在ANSYS上的实践[M].西安:西北工业大学出版社,1999..
  • 2日本铁道综合技术研究所.接近既有隧道施工对策指南[M].,1996..
  • 3[1]JTJ D70-2004,公路隧道设计规范[S].
  • 4[2]TAKINO K,KIMURA H,KAMEMURA K.AND KAWAMOTO T.3-dimensional Ground Behavior at Tunnel Intersection[C].In:Proceedings of International Symposium on Field Measurements in Geomechanics,Zurich.1983.
  • 5[3]TAKINO K,KIMURA H,TAKEDA N and ITO F.Three-dimensional Behavior of Tunnel Intersection[C].In:Proceedings of Fifth International Conference on Numerical Methods in Geomechanics.Nagoya,1985.
  • 6[4]TSUCHIYAMA S,HAYAKAWA M,SHINOKAWA T and KONNO H.Deformation Behavior of the Tunnel under the Excavation of Crossing Tunnel[C].In:Numerical Methods in Geomechanics,Rotterdam.1988.
  • 7[5]Y HORIBE,H YAGI,S OJAYASU et al.Connection between two tunnels under a busy crossing in a big city[C].In:Tunnelling and ground conditions.Proc.Congress,Cairo,1994,ed M.E.A.Salam,(Balkema),1994.
  • 8[6]A SAITOH,K GOM & T SHIRAISHI.Influence forecast and field measurement of tunnel excavation crossing right above existing tunnels[C].In:Tunnelling and ground conditions.Proc.Congress,Cairo,1994,ed M.E.A.Salam,(Balkema),1994.
  • 9张志强 何川 等.深圳地铁一期工程7C标段天虹-岗厦区间隧道施工力学研究报告[R].成都:西南交通大学,2001..
  • 10刘宝琛 廖国华.煤矿地表移动的基本规律[M].北京:中国工业出版社,1965..