摘要
人工湿地作为一种新的矿山废水生态处理工程技术。在实际应用中取得了快速发展。利用新型天然生物质植物中空纤维填料生物膜反应器和人工湿地相耦合的工艺对某尾矿废水处理进行了小试研究。试验结果表明:COD、NH3-N、TN和TP的平均去除率分别为87.57%、90.13%、35.25%和55.15%。
As a new type of ecological wastewater treatment technology,Constructed Wetlands have made many rapid developments in the practical application of mine wastewater.The constructed wetland(CW) coupled with a novel biocarrier biofilm reactor(BBF) was utilized for the tailings wastewater treatment in this paper.The results indicated that the averaged removals of COD,NH3-N,TN,and TP were 87.57%,90.13%,35.25%,and 55.15%,respectively.
出处
《武汉理工大学学报》
CAS
CSCD
北大核心
2010年第14期106-110,共5页
Journal of Wuhan University of Technology
基金
国家"十一五"科技支撑计划重点项目(2007BAB15B00)