摘要
通过火车客运站工程实践的总结,讨论建设过程招标、设计、施工和监理等主要环节的控制,对实现优质工程的目标所采取的措施进行简要介绍。
In order to realize the target of high quality project.the paper discusses the control measures of main steps such as bidding,design,construction and supervision in the whole process,by summarizing construction prac-tice of train terminalin order to realize the target of high quality project.