摘要
结合陕西杨-陈公路施工实例,介绍了风积沙路基施工中最大干密度的确定方法及路基压实的控制重点,保证了风积沙路基的施工质量,提高了效率,降低了成本。
Based on the Yang-Cheng Road Project in Shanxi province, some methods in determining the maximum dry density and compaction keys are introduced, the construction quality of the Aeolian Sand roadbed project is promised, the efficient is iraproved and the cost is cut down
出处
《工程质量》
2010年第8期19-20,共2页
Construction Quality
关键词
风积沙
最大干密度
压实
aeolian sand
maximum dry density
compaction