摘要
详细介绍北京地铁复—八线的防水施工技术。地铁线不同的工程部位(如隧道与车站,车站顶板、底板与边墙)和不同的施工方法(如盖挖法、浅埋暗挖法等),相对应应采用不同的防水方案和防水材料。
Waterproofing technique used in Fu-Ba line of Beijing Subway is described in details in
this paper.Various waterproofing methods and materials should be used in different places(tunnel
and station,top slab,base slab and wall of stations,for example)and with different construction
methods(dig and cover method,shallow underground driving).
出处
《中国建筑防水》
1999年第3期11-15,共5页
China Building Waterproofing
关键词
地铁
防水施工
盖挖法
浅埋暗挖法
Subway Waterproofing
Dig and cover method Shallow underground driving