摘要
采用钻孔灌注桩桩端后注浆提高单桩承载力,结合本工程阐述了桩底后注浆的施工工艺。
Using the pile-end post-grouting technology in boring cassion piles to improve single-pile’s bearing capacity,it poses the pile-end post-grouting'construction technology,main point of quality controll and appliance effects base on the engineering project.
出处
《福建建筑》
2010年第8期75-77,共3页
Fujian Architecture & Construction
关键词
钻孔灌注桩
后注浆
施工工艺
质量控制
Boring Cassion Pile The Pile-End Post-Grouting Construction Technology Quality Controll