期刊文献+

暴雨资料的选样与统计方法 被引量:36

Sampling and statistics of Stormy Data
下载PDF
导出
摘要 暴雨资料的选样有年最大值法和非年最大值法。在理论上,非年最大值法更适合城市排水。但目前所用的年多个样法需要很多资料,统计也很麻烦,以改用年超大值法为宜。年最大值法也可在城市排水中应用,但必须作重现期转换。提出了一种修正的年最大值法,在统计中先转换经验重现期,再推求暴雨公式。这样获得的暴雨公式与现行方法的结果基本一致。 Abstract There are two ways namely annual maximum (AMM) and non annual maximum (NAM) methods for stormy data sampling. Theoretically the later is more suitable to the urban discharge design. Recently the most used annual multi sampling method which demands too much data and complicate statistics will be replaced by annual overmaximal method as best. Also AMM could be applied for urban discharge design, but the conversion of recurrence will be done. The author proposes a modified AMM method, by which the empirical recurrence period will be converse first before the storm formula is deduced. The obtained storm formula by modified statistics is very similar to that by the currently used method. The frequency distribution in the statistics needs no any change.
作者 岑国平
出处 《给水排水》 CSCD 北大核心 1999年第4期1-4,共4页 Water & Wastewater Engineering
  • 相关文献

参考文献6

二级参考文献10

  • 1周黔生.暴雨选样采用年最大值法更实用[J].给水排水,1995,21(6):14-14. 被引量:23
  • 2夏宗尧.给排水工程中应用T=1/P公式的讨论[J]中国给水排水,1988(05).
  • 3周文德,张永平.城市暴雨排水设计问题的预测——概率的考虑[J]水文,1983(01).
  • 4夏宗尧.给排水工程中应用T=1/P公式的讨论[J]中国给水排水,1988(05).
  • 5邓培德,韦鹤平,俞庭康,高乃云.城市暴雨公式统计方法的研究[J]同济大学学报,1985(01).
  • 6邓培德.雨水沟道设计暴雨公式的统计方法[J]建筑技术通讯(给水排水),1979(04).
  • 7周文德,张永平.城市暴雨排水设计问题的预测——概率的考虑[J]水文,1983(01).
  • 8邓培德.雨水沟道设计暴雨公式的统计方法[J]建筑技术通讯(给水排水),1979(04).
  • 9夏宗尧.编制暴雨强度公式中应用P——Ⅲ曲线与指数曲线的比较[J].中国给水排水,1990,6(3):32-38. 被引量:34
  • 10邓培德.城市暴雨公式统计中若干问题[J].中国给水排水,1992,8(3):45-48. 被引量:24

共引文献85

同被引文献312

引证文献36

二级引证文献254

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部