摘要
结合天元化工地基处理的工程实际情况,对强夯地基处理的施工方法进行了详细论述,同时对该方法的检测及工后沉降观测结果等做了简要说明,并通过与复合地基振动碎石桩进行经济比较,指出该方法的优越性,以期为类似工程设计及施工提供指导。
Combining with actual situation of Tianyuanhuagong base treatment project, it specifically discusses dynamic compaction foundation treatment method. Simultaneously, it briefly explains the detection of this method and settlement observation results after eonstruction. Through an economic comparison with compposite foundation vibrating gravel pile, it puts forward advantages of this method, with a view to provide guidance for similar project design and construction.
出处
《山西建筑》
2010年第24期108-109,共2页
Shanxi Architecture
关键词
强夯
地基处理
施工方法
dynamic compaction, foundation treatment, construction method