针对宁波地区首个地铁车站施工存在的风险,从地质、设计及施工等方面对预警原因进行了分析总结,并对监测数据规律异常进行了探讨,为后续的工程建设提出了适当的改进建议。
According to the existing risk in the first subway station construction in the Ningbo district, the paper makes analysis and summary on the warning reasons from the aspects such as the geology, design, eonstruetion and so on, and explores the abnormal regulation of the monitoring data, finally puts forwards appropriate improving suggestion for the following construction.
出处
《山西建筑》
2010年第24期120-121,共2页
Shanxi Architecture
关键词
基坑开挖
测斜数据
无支撑暴露时间
foundation pit excavation, surveying data, non-support expasure time