摘要
通过描述建筑施工中设计变更和现场签证的概念,简单归纳了设计变更和现场签证的内容,详细分析了设计变更和现场签证的作用以及两者的区别与管理,对提高工程投资效益有十分重要的意义。
According to the description of the concepts of the design changes and the site visa in the architectural construction, the paper sums up the contents of the design changes and the site visa, analyzes the roles of the design changes and the site visa and their differences and management, so as to improve the engineering investment benefits.
出处
《山西建筑》
2010年第24期218-219,共2页
Shanxi Architecture
关键词
建筑施工
设计变更
现场签证
管理
architectural construction, design changes, site visa, management