结合长兴岛电厂圩滩涂圈围工程允许部分越浪的海堤断面,对堤顶高程、越浪量、堤身设计进行了介绍,并结合模型试验结果对设计计算结果进行了对比分析,表明采用允许部分越浪的堤防设计可降低堤顶高度,节约工程投资。
By combining with the sea embankment' s sections of permitted part overwash in tidal flat project of Changxing island' s power plant, the paper introduces the embankment top elevation, the wave overtopping, and the embankment design, and compares and analyzes the design calculation results for the model testing results, and indicates that the adoption of the embankment design for the permitted part over- wash can reduce the embankment top's height, and save the engineering investment.
出处
《山西建筑》
2010年第24期362-363,共2页
Shanxi Architecture
关键词
海堤
允许部分越浪
堤顶高程
模型试验
sea embankment, permitted part overwash, embankment top elevation, model test