摘要
本文以杭州港某港池的整体稳定性为主要研究问题,分别从加固前、施工时和加固后三个时间段分析它的整体稳定性,采用的计算软件是拿大岩土工程边坡分析专业程序SLOPE/W。
It studies he whole Stablity of Harbor Basin in Hangzhou Harbor in this paper.It has three parts which are before strenthening,consructing and after strenthening.The compute soft is SLOPE/W which is applied to slope analysis in Canada.
出处
《现代物业(新建设)》
2010年第1期97-98,共2页
Modern Property Management
关键词
港池
整体稳定性
加固
Harbor Basin
The whole Stablity
Strengthen