输电杆塔真型试验位移测量系统的研究 被引量:1

Study on Displacement Measurement system of Transmission Tower Full-scale Test
原文传递
导出
摘要 位移测量是杆塔真型试验的主要内容之一,研究了特高压杆塔试验基地位移测量系统的组成、工作原理和关键技术。系统涉及的关键技术包括数据库技术、自动测试技术、系统互连技术和试验报表的自动生成。使用结果表明,该系统各项指标均达到了预期要求,满足了特高压杆塔试验的位移测试需求。 Displacement measurement was one of the main contents of full-scale tower test.The composition working theory and key technologies of the test system of ultra-high voltage tower displacement measurement system were studied.The key technologies involved in the system included database technology,automatic test technology,system interconnection technology and automatic generation of test report.The application results showed that all the indexes of the system had reached to the expected requirements and satisfied the needs of the displacement measurement of
出处 《华东电力》 北大核心 2010年第7期1034-1037,共4页 East China Electric Power
关键词 特高压杆塔 杆塔真型试验 位移测量 ultra-high voltage tower test.ultra-high voltage tower tower full-scale test displacement measurement
  • 相关文献

参考文献5

  • 1何长华,李正,陈海波.中国输电线路杆塔试验站[J].国际电力,2001,5(1):42-44. 被引量:8
  • 2刘万贵.国外杆塔试验简介[J].国际电力,2001,5(1):45-48. 被引量:10
  • 31EC60652-2002 Loading Tests on Overhead Line Structures [S].
  • 4安平.特高压杆塔试验基地数据采集及试验管理系统研究[R].北京:中国电力科学研究院,2009.