基于DEA的发电建设项目进度、成本、质量联合控制 被引量:6

DEA-Based Joint Control of Schedule,Cost and Quality in Power Generation Construction Project
原文传递
导出
摘要 目前,国内外对于电力行业建设项目控制主要集中在项目进度、成本、质量单个方面或2个方面的研究,对于把3个因素联合起来分析的研究比较少。运用数据包络分析方法,以电力行业建设项目中的进度、成本、质量为研究对象,建立电力行业建设项目的进度、成本、质量联合控制评价模型。根据权威统计数据,运用此评价模型对中国12个电力行业建设项目进度、成本、质量进行了实证研究,给出了12个电力建设项目的进度、成本、质量联合控制的客观评价值,并对结果进行了分析,为国家对电力行业进行宏观调控提供了理论依据,为改进电力项目的进度、成本、质量的控制提出了政策建议。 Up to now,control of power construction projects both at home and abroad have mainly focused on one or two of the three factors including project schedule,cost and quality.All of the above three factors,however,have seldom been studied comprehensively.The data envelopment analysis(DEA) method is used in this paper to establish a joint control evaluation model of schedule,cost and quality for power construction projects.Based on the authoritative statistics,a case study is carried out for 12 construction projects in China,in term of joint control of the schedule,cost,and quality,and the obtained results are analyzed,which can provide a theoretical basis for the state government to make a macro regulation and control of the electric power industry.Some policy recommendations are also provided for improving the control of the power projects in schedule,costs and quality.
出处 《电力建设》 2010年第8期100-103,共4页 Electric Power Construction
关键词 电力建设项目 数据包络分析(DEA) 联合控制 进度 成本 质量 power construction projects data envelopment analysis(DEA) joint control schedule cost quality
  • 相关文献

参考文献7

二级参考文献19

  • 1韩锟.工程项目管理:发展趋势与应对策略[J].建筑经济,2005,26(2):67-70. 被引量:35
  • 2邱菀华.项目管理学—工程管理理论、方法与实践[M].科学出版社,..
  • 3A Guide to the Project Management Body of Knowledge (2000 Edition ). Sailcon-Joint Training Center of Project Management, Sail-con Economic Information Consulting Co.
  • 4McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 5Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 6Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
  • 7Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
  • 8Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
  • 9Ahuja H M,Arunachalam V.Risk evaluation in resource allocation[J].Journal of Construction Engineering and Management,ASCE,1984,110(4):324-336.
  • 10Padilla E M,Carr R I.Resource strategies for dynamic project management[J].Journal of Construction Engineering and Management,ASCE,1991,117(2):279 -293.

共引文献226

同被引文献30

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部