软土盾构直接切削钢筋混凝土桩基施工技术 被引量:26

On Construction Technique of Soft Soil Shield Cutting Directly Reinforced Concrete Pile Foundation
下载PDF
导出
摘要 叙述了上海轨道交通10号线5.1标盾构切削钢筋混凝土桩基的施工特点。通过改制盾构刀盘及安装能破碎硬物的装置,在施工中控制总推力、推进速度、刀盘扭矩等参数,不仅顺利地切削桩基,而且控制了施工过程中产生的地表沉降及周边构筑物的沉降。该技术可供类似工程借鉴。 The construction characteristics of shield cutting reinforced concrete pile foundation of Bid 5.1, Shanghai rail transit No.10 line, are put forward in the paper. Through the refitment of shield cutter and the installation of breaking plant and the parameters control of total thrust force, propulsion speed and cutter torque, cutting the pile foundation is completed successfully, furthermore, the settlements of the ground and the surrounding structures are controlled well, which can provide the references for the similar projects.
出处 《中国市政工程》 2010年第4期46-47,共2页 China Municipal Engineering
关键词 盾构机改制 切削钢筋混凝土桩基 施工参数 施工监测 shield machine refitment cutting reinforced concrete pile foundation construction parameter construction monitoring
  • 相关文献

参考文献1

二级参考文献2

共引文献51

同被引文献133

引证文献26

二级引证文献138

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部