摘要
结合在建成都地铁通越冶金宾馆的施工,介绍了成都卵石土地层中盾构机下穿桩基础建筑物的施工经验。重点介绍了盾构下穿既有建筑物时采用的地下掘进参数控制、地面跟踪注浆、荷载转移等方法,以上方法的综合应用经验对卵石土地层中盾构的施工有着较好的借鉴意义。
This article, with a combination of the construction of crossing Metallurgy Hotel of Chengdu subway, introduces the construction experience of crossing existing buildings in sand-pebble layer. It introduces the underground excavation parameter control, ground tracing grouting, and loading transfer when crossing existing buildings. The comprehensive application of the methods above can be very beneficial to other similar projects.
出处
《铁道建筑技术》
2010年第8期44-47,共4页
Railway Construction Technology
关键词
盾构施工
既有建筑物
跟踪注浆
荷载转移
shield method construction
existing buildings
tracing grouting
loading transfer