期刊文献+

某铁矿选厂生产调试与技术改造

Production commissioning and technical transformation of some iron ore separation plant
下载PDF
导出
摘要 因矿石性质变化,选厂选矿技术指标达不到要求。通过试验研究、流程考查、系统分析各段工艺参数,发现流程中存在的问题,并对一次磨矿分级、二次磨矿分级、渣浆泵、脱水槽、细筛、磁选机、脱水系统、供水系统分别改造,改进选别、筛分设备,使流程能适应处理不同性质的矿石,提高了回收率和处理矿量。 Ore dressing technical indexes in the separation plant did not reach the standard required because of the changes of ore property.Problems in the process were discovered by test,process investigation and systematic analysis of technical parameters of different stage.The primary and secondary grinding and classification,slurry pump,dewatering tank,fine screen,magnetic separator,dewatering system,water supply system were transformed,and separating equipment and sieving equipment were improved, which could make process adapt to the different ore,and improve the recovery rate and milling capacity.
作者 王攀志
出处 《中国矿山工程》 2010年第4期29-32,共4页 China Mine Engineering
关键词 磁选 试验 生产调试 流程考查 工艺改造 magnetic separation test production commissioning process investigation process transformation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部