期刊文献+

煤矿深部Y型大断面交岔点双控锚杆支护技术及工程应用 被引量:15

APPLICATION AND DOUBLE-DIRECTION CONTROL BOLT SUPPORT TECHNOLOGY OF LARGE SPAN Y-TYPE INTERSECTION IN DEEP COAL MINE
下载PDF
导出
摘要 在复杂工程地质条件下,煤矿深部Y型大断面交岔点严重变形,牛鼻子部位破坏尤为严重。通过现场调查及理论研究,总结深部Y型大断面交岔点的典型破坏形式。研究表明深部高应力、牛鼻子部位两侧无约束分别支护是其破坏的主要原因,提出深部Y型大断面交岔点双控锚杆支护技术。将研究成果应用于夹河矿深部交岔点工程中,应用效果良好。 Under geological conditions at deep coal mine, the crossing roadway especially Y-type experienced large deformation. The junction pillar cguld be the weakest link. Based on in-situ investigation and theoretical study, typical forms of the destruction were summarized. High stress and unrestrained deformation at two sides of junction pillar were two main factors affecting the stability of the cross-section. Deep Y-type large cross-section junction double-control anchor support technology was proposed. The technology has been used in deep intersection engineering in Jiahe coal mine.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2010年第A01期2792-2798,共7页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金重大项目(50490270) 国家重点基础研究发展规划(973)项目(2006CB202200) 教育部创新团队项目(IRT0656)
关键词 采矿工程 深部 交岔点 双控锚杆 支护技术 mining engineering deep intersection double directions control bolt support technology
  • 相关文献

参考文献15

二级参考文献117

共引文献2566

同被引文献123

引证文献15

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部