摘要
在风电工程建设过程中,由于设计进度受采购计划和内部资料的制约,而影响施工图计划工期目标的实现。为解决该问题,本文探讨了如何建立接口与进度计划的关联,从设计输入的角度对施工图进行动态控制,并在P3ec软件进行实现接口与计划的关联。
During the construction of wind power station, the design progress is restricted by purchase interface and inner interface, the expected goal departures from the planned one. In order to settle this problem, this paper discusses how to build the relation between interface and engineering progress and dynamically controls the departure with P3ec.
出处
《科技信息》
2010年第23期J0171-J0172,共2页
Science & Technology Information
关键词
风电
接口
设计进度
Wind power
Interface
Design schedule