城市污水处理厂设备带负荷调试是实现项目目标的最后也是最重要的环节,自然就成为设备监理工作的关键环节。结合多座大中型城市污水处理厂建设的监理实践经验,介绍了调试监理质量计划的制定、准备阶段、实施调试过程中需把握的要点及主要机械设备质量调试要素等,以供参考。
Commissioning of equipment under load in MWWTP is the last and the most important step to achieve the project purpose, and it is also a key step in equipment supervision. Combined with the supervision practice of several large and middle MWWTPs, the establishment and preparation of commissioning supervision quality plan, the main points needing attention in the commissioning process as well as the quality commissioning of main mechanical equipment are introduced for reference.