实验考察了膨胀颗粒污泥床(EGSB)反应器处理焦化废水的启动运行特点。先以COD为500~2 000mg/L的啤酒废水培养颗粒污泥,35 d的时间COD去除率达90%左右;再用焦化废水和啤酒废水的混合液驯化颗粒污泥,并逐步提高焦化废水所占的比例,约6个月的时间反应器对COD为2 000 mg/L左右的焦化废水的COD去除率稳定在55%,且颗粒污泥的性能良好,可以认为启动工作完成。
The characteristics of the start-up operation of lab-scale EGSB reactor for treating coking wastewater have been investigated.When the granular sludge is cultivated with brewery wastewater whose COD is 500-2 000 mg/L,the COD removal rate reaches about 90% in 35 d.Then,the granular sludge is acclimatized with the mixture of cok-ing wastewater and brewery wastewater.The COD proportion of coking wastewater is increased gradually.Within 6 months or so,the COD removal rate of 2 000 mg/L coking wastewater remains on 55% steadily in the reactor.The ca-pability of granular sludge is favorable and the start-up operation has thus been finished.