摘要
根据绵阳市富临桥(人行天桥)灾后加固改造工程施工设计文件图及原桥施工竣工图,结合该桥的现场实际情况,提出一套合理的加固施工监测与控制方法,从而保证富临桥加固施工达到设计预期目的,确保加固施工过程中桥梁结构的安全。
According to construction design files to strengthening reconstruction project of Fulin Bridge(pedestrian overpass) in Mianyang city after earthquake and the original bridge's construction as-completed drawings,combine practical work with the bridge,put forward a reasonable method of construction monitoring and control method,so as to ensure Fulin Bridge strengthen construction is expected the aim to design,guarantee the structural is safe in the process of strengthen construction.
出处
《山西建筑》
2010年第25期325-326,共2页
Shanxi Architecture
关键词
人行天桥
加固
施工控制
pedestrian overpass
strengthen
construction control