摘要
2×930MW利彭多夫火电厂是建在德国东部褐煤矿区的第2座大型火电厂。采用了超临界蒸汽参数及很高的再热温度,电厂净效率将达到42.4%。它将成为世界上最高水平的褐煤电厂之一。第一台机组将于1999年10月投入运行。
The 2 × 930MW Lippendorf power plant will be the second large power plant, to be built in the lignite fields of eastern Germany. Employing supercritical steam conditions and high reheat temperature, the plant will operate with a net efficiency of 42.4 per cent. It is one of the highest levels achieved for lignite-fired plant worldwide.The first unit will go on line in October 1999.
关键词
火电厂
设计
褐煤电厂
施工
Lignite-fired power plant
930MW unit
Design Construction