岩土工程问题的过程分析 被引量:1

Process Analysis of Geotechnical Engineering Problems
下载PDF
导出
摘要 论文通过设计埋管土压力实例,说明若不考虑施工过程与工程条件,就会误算作用在涵洞上的竖向土压力。对高填方路堤地基的沉降计算,若不考虑施工过程,其计算结果与现场实测结果就存在很大的差别。对研究性问题,若实验方案设计不合理,不进行研究对象的过程分析,就容易把实际工程中不存在的试验结果误当作成果和规律运用。 Through the design of earth pressure pipes,it is illustrated that the vertical earth pressure on culvert would be miscalculated without considering the construction and engineering conditions,for the settlement calculation of high filling foundation,there is a big difference between the calculated result and field measured result without considering the construction process.And for research problems,it is easy to mistake the experimental design not existed in practical projects for the achievements and rules if the experimental design is unreasonable and the process analysis about research objects is not made.
出处 《水利与建筑工程学报》 2010年第4期79-80,85,共3页 Journal of Water Resources and Architectural Engineering
基金 国家西部交通建设利技项目(200231881224)
关键词 过程分析 埋管土压力 实测沉降过程 模型试验 process analysis pipe earth pressure measured settlement process model test
  • 相关文献

参考文献4

  • 1A.P莫泽.地下管计算[M].北京:机械工业出版社,2003:42.
  • 2Hirohisa Kamata,Hideto Mashimo.Centrifuge model test of tunnel face reinforcement by bolting[J].Tunnelling and Underground Space Technology,2003,18:44-51.
  • 3杨锡武,欧阳仲春.加筋高路堤陡边坡离心模型的研究[J].土木工程学报,2000,33(5):88-91. 被引量:18
  • 4顾安全.上埋式管道及洞室垂直土压力的研究[J].岩土工程学报,1981,(1).

二级参考文献3

共引文献76

同被引文献10

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部