2G Bortone, S Marsili Libelli,et al.Anoxic phosphate uptake in the Dephanox process. Wat Sci Tech,1999,40(4-5):177~185
3P Cooper,M Day,V Thomas.Process options for phosphorus and nitrogen removal from wastewater.J IWEM,1994,8(2):85~92
4T Kuba,et al. Phosphorus and nitrogen with minimal COD requirement by integration of denitrifying dephosphatation and nitrification in a two-sludge system. Wat Res 1996,30(7): 1702~1710
5J Wanner,et al. New process design for biological nutrient removal. Wat Sci Tech, 1992,25(4-5):445~448
6George A Ekama, Mark C Wentzel. Difficulties and developments in biological nutrient removal technology and modelling.Wat Sci Tech,1999,39(6):1~11