3Harold Kerzner.Project Management:A Systems Approach to Planning,Scheduling,and Controlling[M].John Wiley and Sons,2009:34-41.
二级参考文献6
1大岛义弘.首都高速道路の交通事故对策[J].日本道路协会:道路,1998,(9):21-26.
2威同庆编译.各国向途中故障车辆提供技术援助的方法和设备[J].城市交通管理,1986,(6).
3三桥吉信.都市间高速道路の交通事故对策.日本道路协会:道路,1998(9):14-20.
4ITS HANDBOOK in JAPAN.HIDO,1997.
5Daviet B,Attia J L,Fremont G.Automatic Incident detection (DAI)through Video Picture Analysis,Proceedings of the lst World Congress on Applications of Transport Telematics and Intelligent.Vehicle-Highway Systems.pp.2809-2814.
6Xiao-guang Yang,Chao Yang,Pei-kun Yang,Dynamic Traffic Control System for Urban Expressway.Berlin: 4th World Congress on Intelligent Transport Systems,1997-10.