摘要
从工程的计划工期出发,结合施工作业空间、施工场地对施工资源的使用种类、数量的限制,利用模糊数学知识,采用综合评判的方法,提出了现有社会生产力水平条件下及某施工企业具有施工资源条件下的两类施工方案评判模型,并以路基工程为例,给出了一实例。
Based on the designed limit time of the project,combined the restriction of the working space and the working ground,the paper used fuzzy multi hierachical comprehensive evaluation and put forward two optimum decision making models that meet update level of social construction capacity and the working sources that a construction corporation owned.Then gave an example of sub grade work. It showed that the above optimum decision making models can be put into practice.
出处
《武汉交通科技大学学报》
1999年第3期293-297,共5页
Journal of Wuhan University of Technology(Transportation Science & Engineering)
关键词
施工方案
模糊综合评判
公路工程
优选
highway
construction scheme
working space
working sources
fuzzy multi hierachical comprehensive evaluation