摘要 以巴基斯坦QICT二期项目为例,分别对大直径钢管桩在复杂地质条件下的设备选型、钻打结合施工方法和最终承载力复核进行了分析和探讨。 Taking Qasim International Container Terminal Phase 2 Project in Pakistan as an example,this paper probes into the selection of construction equipment,construction method of drilling and driving,as well as the checking of the ultimate bearing capacity for the large-diameter steel pipe piles installed under complicated geologic conditions.
出处 《水运工程》 北大核心 2010年第8期147-152,共6页 Port & Waterway Engineering
关键词 大直径钢管桩 复杂地质 钻打结合 QICT Phase 2 Project large-diameter steel pipe pile complicated geologic condition drilling and driving
  • 相关文献

参考文献8

  • 1Marine Geo Solutions Ltd.Geotechnical site investigation report[R].HongKong:Marine Geeo Solutins Ltd,2007.
  • 2中交第四航务勘察设计院.QICT二期项目地质钻探图[R].广州:中交第四航务工程勘察设计院,2008.
  • 3MJ Tomlinson.Pile design and construction practice[M].4th Edition.London:E & FN Spon,1994.
  • 4JTJ 254-1998,港口工程桩基规范[S].
  • 5JTJ215-1998,港口工程荷载规范[S].
  • 6JTJ291-1998,高桩码头设计与施工规范[S].
  • 7BS6349Code of Practice for Maritime Structures[S].
  • 8BS 8004Code of Practice for Foundations[S].

共引文献98

同被引文献66

引证文献13

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部