摘要
对集注站采气系统天然气预冷器出口工艺管道的直管段焊接后横向收缩过大的原因进行了分析,提出了应采取的预防措施。
In order to effectively control the straight pipe sections after welding horizontal contraction problem is too large,the problem arising from an analysis of the reasons,the precautionary measures was put forward and taken.
出处
《石油化工设备》
CAS
2010年第B08期77-79,共3页
Petro-Chemical Equipment
关键词
预冷器
管道
焊接
变形
处理
precooler
pipe
welding
deformation
measure