期刊文献+

欠平衡钻气井井口回压控制理论及实践 被引量:3

Theory and Practice of Controlling Wellhead Back Pressure in UBD
下载PDF
导出
摘要 欠平衡钻气井的井控问题长期以来一直是该技术领域的一道难题。通过分析井筒流动规律并耦合地层产气得出欠平衡钻气井井控的有效方法——施加井口回压。建立了井筒流动方程和地层产能方程以及求解方法,阐述了施加井口回压可以提高欠平衡钻气井井控效果的理论机理,并通过案例分析得出施加井口回压对欠平衡钻气井的井控效果。研究发现,施加井口回压既可以使进入井筒的地层气体减少,又可以使气体体积变小,有利于欠平衡钻井的携砂和井控。 Well control is very thorny during underbalanced drilling (UBD) of gas wells. In this study, based on an analysis on wellbore flow principle coupled with gas production from formation, an effective method of UBD well control,imposing wellhead back pressure, is gained. Moreover, the wellbore flow equation, formation deliverability equation and solution method are established; the imposing wellhead back pressure may increase a theoretical mechanism of well control; and a wellcontrol effect on UBD is obtained based on case study. The results show that the imposing wellhead back pressure can not only reduce the formation gas entering into wellbore but also lessen the gas volume entering into wellbore. which are favorable for sandcarrying and wellcontrol during UBD.
出处 《天然气技术》 2010年第4期21-23,共3页 NATURAL GAS TECHNOLOGY
关键词 井口回压 压力控制 欠平衡 气井 地层产能 wellhead back pressure, pressure control, underbalanced, gas well, formation deliverability
  • 相关文献

参考文献2

二级参考文献8

  • 1王铭华.气藏工程[M].北京:石油工业出版社,1997.82-85.
  • 2李相方 陈至达.气液两相流偏微分方程组求解.现代数学与力学[M].徐州:中国矿业大学出版社,1993.75-95.
  • 3[1]Don Hannega,Richard J.Todd,David M.Pritchard,et al.MPD-Uniquely Applicable to Methane Hydrate Drilling,SPE/IADC 91560,2004
  • 4[2]Don M.Hannegan.Managed Pressure Drilling in Marine Environments-Case Studies,SPE/IADC 92600,2005
  • 5[3]D Reitsma,E.van Riet.Utilizing an Automated Annular Pressure Control System for Managed Pressure Drilling in Mature Offshore Oilfields,SPE 96646,2005
  • 6[4]Georgr H.Medley and Patrick B.B.Reynolds,Distinct variations of managed pressure drilling exhibit application potential.World Oil,March 2006,227(3):41~44
  • 7[5]R.Soto,J.Malavé,C.Díaz.Managed Pressure Drilling (MPD):Planning a Solution for San Joaquin Field,Venezuela,IADC/SPE 991161,2006
  • 8[6]Ali G.Kadaster,Keith K.Millheim,Tommy W.Thompson.The Planning and Drilling of Hot Ice #1-Gas Hydrate Exploration Well in the Alaskan,SPE/IADC 92764,2005

共引文献105

同被引文献31

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部