摘要 关键设备直接关系着产品的生产周期和质量,一定程度上可以认为是离散生产系统的"瓶颈"。因此,需要为关键设备设立一定的生产缓冲来保障其运行的持续性和平稳性。针对灰信息下的生产系统,创新性地定义灰色Petri网并设计其有效算法;在分析关键设备缓冲作用机理的基础上,针对灰信息下关键设备生产缓冲问题,构建关键设备生产缓冲的灰色Petri网模型,结合遗传算法进行仿真运算,探寻其最优解;以某产品生产线为案例,验证模型及算法的有效性和实用性,为生产系统关键设备管理工作提供了一种新的方法和思路。 In the production system, the critical equipment decides the production cycle and quality. In a sense, the critical equipment can be considered as the "bottleneck" of the whole production system . As a consequence, a certain production buffer should be set up to ensure the critical equipment working continuously. In this paper, in order to get an optimal result under the grey information, the authors firstly define and set up the "Grey Petri Net" and its algorithm applies. Secondy, a Petri Net analyzing model is set up to illustrate the principle of the buffer before fhe critical equipment. Thirdly, the authors establishe the buffer Petri net then simplify and solve it. Furthermore the authors apply genetic algorithm to get the optimal result. At last an example is applied to show the feasibility and effectiveness of the method, getting a good result.
出处 《中国管理科学》 CSSCI 北大核心 2010年第4期107-113,共7页 Chinese Journal of Management Science
基金 国家自然科学基金资助项目(70971064) 国家社科基金重点项目(08AJY024) 江苏省普通高校研究生科研创新计划项目
关键词 灰信息 关键设备 生产缓冲 PETRI网 grey information critical equipment production buffer Petri net
  • 相关文献

参考文献4

二级参考文献27

  • 1张维迎.博弈论与信息经济学[M].上海:上海人民出版社,2000..
  • 2[1]John J McManus. Control in the OPT environment [ J ]. Production Engineer, 1987,7 - 8: 20 - 21.
  • 3[2]Pisal Yenradee. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory [J]. Computers Industrial Engineering, 1994,27 ( 1 - 4 ): 217 -220.
  • 4[3]Thomas Corbett, Joao Mario Csillag. Analysis of the effects of seven drum- buffer- rope implementations [ J]. Production and Inventory Management Journal ,2001,3/4: 17 - 23.
  • 5[4]Robert Lundrigan. What is this thing called OPT? [J]. Production and Inventory Management, 1986,2: 2 - 11.
  • 6[5]F. Robert Jacobs. OPT uncovered: many production planning and scheduling concepts can be applied with or without the software [ J ]. Industrial Engineering, 1984,10: 32 - 34,36,38,41 - 42.
  • 7[6]C - H CHU, JC Hayya. Buffering decisions under MRP environment:a review [ J ]. OMEGA, 1988,16 (4): 325 - 331.
  • 8[7]J Miltenburg. Comparing JIT, MRP and TOC, and embedding TOC into M RP [ J]. International Journal of Production Research, 1997,35(4) : 1147 - 1169.
  • 9[10]Eli Schragenheim, Boaz Ronen. Drum - buffer - rope shop floor control [ J]. Production and Inventory Management Journal, 1990,(3) :18 -22.
  • 10[11]V. D. R. Guide. Scheduling using drum - buffer - rope in a remanufacturing environment [ J]. International Journal of Production Research,1996,34(4): 1081 - 1091.

共引文献79

同被引文献53

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部