摘要
固体脱硫塔是气田脱硫工程的重要设备之一。通过对地处沙漠腹地的塔中6气田脱硫工程的固体脱硫塔吊装方案的介绍,详细分析了固体脱硫塔吊装费用及运输费用,为沙漠工程的概预算编制中大型设备的费用计算问题提供了一些借鉴和参考。
Solid desulfurization tower is one of important equipment in gas field desulfurization project.Described are lifting options for the solid desulfurization tower of Tazhong 6 Gas Field desulfurization project in Xinjiang desert hinterland,analyzed are lifting and transportation costs of the tower,which has some reference values for budget estimate of large equipment costs in desert projects.
出处
《天然气与石油》
2010年第4期43-47,共5页
Natural Gas and Oil
关键词
固体脱硫塔
运输
吊装
概算
费用
Solid desulfurization tower
Transportation
Lifting
Estimation
Cost