摘要
随着风能大范围的推广应用,湖南省规划建设1号风电场。通过分析计算1号风电场的穿透功率极限及其影响因素,为规划设计1号风电场提供参考。
With popularization and application of large-scale wind energy, Hunan province plans to build No. 1 wind farm. Based on analysis and calculation of power penetration limit on No. 1 wind farm and its influence factors, this paper gives references for plan and design of No. 1 wind farm.
出处
《湖南电力》
2010年第4期17-20,51,共5页
Hunan Electric Power
关键词
风电场
穿透功率极限
直驱永磁同步发电机
wind farm
wind power penetration limit
direct-drive permanent magnet synchronous generator