摘要
高摩赞大坝枢纽工程的设计工作是在EPC合同条件下进行的。设计成果既要满足业主要求及国际标准和规范,又吸收了国内近年来发展的新技术。设计工作以周密的地质勘察、科学试验和计算分析为基础,以使设计产品达到技术先进、安全可靠和经济合理的要求。
Design of Gomal Zam Dam Multipurpose Project is based on EPC contract. It shall not only meet the Employer's requirement and international standards and codes,but introduce domestic new developed technology.The design is based on careful geologic investigation,scientific test and calculation to make the project is advanced,safe and reliable in technology and reasonable in economy.
出处
《水利水电工程设计》
2010年第3期1-5,共5页
Design of Water Resources & Hydroelectric Engineering
关键词
EPC合同
国际标准和规范
大坝
下游防护
厂房布置
高摩赞大坝枢纽
EPC contract,international standards and codes,dam,downstream slope protection,powerhouse layout,Gomal Zam Dam Multipurpose Project.