期刊文献+

大花水RCC双曲拱坝施工期仿真分析

Simulating Analysis of Construction of Dahuashui RCC Double-curvature Arch Dam
下载PDF
导出
摘要 大花水RCC拱坝(H=134.5m)是世界上已建的最高的碾压混凝土双曲薄拱坝。大坝在碾压施工过程中,陆续发现了十几条裂缝,并有多条贯穿性裂缝。本文通过对全坝进行施工期全过程仿真分析,对施工过程中出现的裂缝现象进行深入细致的分析,得出施工过程中温度应力过高是导致大坝裂缝产生的重要原因。 Dahuashui RCC arch dam(H=133m) is the highest RCC double-curvature arch dam under construction in the world.During construction,more than 10 cracks have been found in the area of dam,among which 6 cracks are perforative.Simulating analysis of construction process of Dahuashui RCC arch dam is carried out in this article.According to analysis results,thermal stress happened in construction period has exceeded strength of concrete,which is the main cause of cracks.
出处 《中国水能及电气化》 2010年第8期19-25,共7页 China Water Power & Electrification
关键词 RCC双曲拱坝 施工期仿真分析 裂缝成因 RCC double-curvature arch dam simulating analysis of construction process cause of cracks
  • 相关文献

参考文献4

  • 1张国新.大体积混凝土结构施工期温度场、温度应力分析程序包SapTis编制说明及用户手册.1994.
  • 2张国新,许平,杨波,朱伯芳.整体拱坝的仿真与可行温控措施[J].水利水电技术,2002,33(12):19-22. 被引量:11
  • 3中国水利水电科学研究院结构所.大花水碾压混凝土拱坝施工期反演分析及初次蓄水仿真分析[R].2007.8.
  • 4郑璀莹,张国新等.陈村拱坝的裂缝成因分析[C].昆明:Hydropower2006.2006.10.